How can we help?

Operations Services

  • Request Temp Service

    Request to connect or disconnect temporary power for Builders and Developers ONLY.

  • Request Permanent Service

    Once the lot is at final grade and the path is clear to the installed meter base, a Permanent Service Agreement and Release for Overhead and/or Underground Electric Service Construction may be submitted for each lot desired.

  • Right of way request

    Maintaining a clear ROW ensures the reliability of our system and helps to prevent this scenario from happening. Our ROW crews are continuously working to trim the trees and brush from the more than 7,100 miles of power lines along our system.

  • Learn about Load Data submission

    Contact us through a specially prepared form.

  • Report Outdoor Light Outages

    Have an outdoor light that needs maintenance? Click here to view the map and report the maintenance request.

  • Make a Payment

    Payments made from 11:50 p.m. to 12:20 a.m. will not post due to system maintenance. Using bank bill pay? Set up each GreyStone account separately. Paying by card? MasterCard, Visa, and Discover are accepted, but not American Express.

More resources

  • ➜ Electric Vehicles (EVs)

    Electric Vehicles (EV) Cost Less To Operate Than Gas Powered Cars. EV operation can be three to five times cheaper than gasoline and diesel powered cars, depending on your local gasoline and electric rates.

  • ➜ Storm Center

    TIPS ON HOW TO WEATHER THE STORM: First, open the freezer door as little as possible. According to the CDC, if the doors stay closed, food will stay safe up to: four hours in a refrigerator, 48 hours in a full freezer and 24 hours in a half-full freezer. Discard any perishable food, including meat, poultry and seafood, that has been above 40 degrees Fahrenheit for more than two hours. Learn More..

  • ➜ Report an Outage

    When electricity is out, we all hope it will be restored as quickly as possible. GreyStone works around-the-clock during every outage to make that happen. But there are several priorities that can’t be changed in order for the restoration process to work.

  • ➜ Economic Development

    GreyStone Power Corporation has always been involved with promoting economic development with the communities we serve. We are actively involved with our local Chambers of Commerce and are constantly working with the industrial building authorities to attract new industries and grow existing ones. This provides jobs for our membership and the communities we serve. Learn More..